22345

July 18, 2025 SA Bianco Precast Norwood Green - Osmond Level 4. 16.00 VIEW PDF CSV

22344

July 18, 2025 SA United Precast UP1265 - Badmington Location: North panels before structural frame goes on
Western panels, back entrance, dado panels so it can be grouted.
task 1: caulking on lines on top of back entrance so it can be grouted, interior and exterior.
task 2 : it was completed top lines before structural steel goes on.
remaining areas: bottom lines and exterior caulking.
8.50 VIEW PDF CSV

22343

July 18, 2025 QLD CIP Constructions Group (QLD) PTY LTD C4-054C-0032 - Oxley 32 Blunder Road Parking 8.00 VIEW PDF CSV

22342

July 17, 2025 QLD BPG Constructions Herston 51 Bramston Tce Ground 16.00 VIEW PDF CSV

22341

July 17, 2025 QLD CIP Constructions Group (QLD) PTY LTD C4-054C-0032 - Oxley 32 Blunder Road Car park 8.00 VIEW PDF CSV

22340

July 17, 2025 SA United Precast UP 1184 Holden Hill Warehouse caulking 8.50 VIEW PDF CSV

22339

July 16, 2025 SA Hicrete Precast (Pelligra) Pty Ltd 691 Port Road - Woodville Pre pour joints and standing heights 7.50 VIEW PDF CSV

22338

July 17, 2025 SA Hicrete Precast (Pelligra) Pty Ltd 22 Millicent st Internal and external caulking. 8.50 VIEW PDF CSV

22337

July 17, 2025 SA Bianco Precast Norwood Green - Osmond Level 4. 16.00 VIEW PDF CSV

22336

July 17, 2025 QLD Novus Precast PTY LTD Wellcamp 7 Vision Street Site 16.00 VIEW PDF CSV

22335

July 17, 2025 SA United Precast UP1226 - Woolcock Tonsley Stage 2A location: all panels that were used as retaining wall, north and east panels, panels facing junction apartment and facing backyard.
task: exterior caulking, and double caulking behind steel as demonstrated by photos.
Builder required this caulking as priority, since he wants backfilling with sand, behind all those panels. panels already waterproofed.
3.00 VIEW PDF CSV

22334

July 17, 2025 SA United Precast UP1174 - Junction Apartments Location: South panels.
task: jump on the boom and place, backing rod on top of panels.
task 2 , complete placing backing rod through level 3, because boom could not reach the entire panel.
task 3 placing backing rod on top of remaining panels, which were still on the truck.
ps. very tricky access with the boom. placing the boom in a little void below the panels.
1.50 VIEW PDF CSV

22333

July 17, 2025 SA United Precast UP 1184 Holden Hill location: completed Western top panels, and southern eastern panels next to front entrance.
task1 : only interior caulking on the boom lift. Only top of lines before structural steel goes on.
4.00 VIEW PDF CSV

22332

July 16, 2025 SA United Precast UP1265 - Badmington – 315 main north road
– caulking tops using a boom lift
task: it was given priority to caulk tops before structural steel comes.
location: western panels and main entrance panels.
4.75 VIEW PDF CSV

22331

July 17, 2025 SA Bianco Precast Adelaide Market Square - Plates Level 5
Level 6
Level 9
Level 11
16.00 VIEW PDF CSV