Row ID

Date

STATE

Customer

Job Site

Location of Works TTL LBR View PDF CSV

19632

September 6, 2024 NSW ADSEAL ADMIN Site and office 10.50 VIEW PDF CSV

19631

September 5, 2024 NSW ADSEAL ADMIN Site and office 10.50 VIEW PDF CSV

19630

September 7, 2024 SA Bert Farina Construction 23 Adelphi Terrace, Glenelg North Level 1,2,3.
*Application of HB and FC
* sending
15.00 VIEW PDF CSV

19629

September 6, 2024 QLD ADSEAL ADMIN Sites and office 11.00 VIEW PDF CSV

19628

September 5, 2024 QLD ADSEAL ADMIN Site and office 8.00 VIEW PDF CSV

19627

September 6, 2024 SA Bert Farina Construction 23 Adelphi Terrace, Glenelg North IT’S A REPLACEMENT DSO: 19626
Front of the building
12.50 VIEW PDF CSV

19626

September 6, 2024 SA Bert Farina Construction 23 Adelphi Terrace, Glenelg North Front of the building 14.50 VIEW PDF CSV

19625

September 6, 2024 SA Hicrete Precast Systems Pty Ltd National Storage Marion Interior caulking and exterior caulking.
Storage up front at ground floor and level 1.
Remaining around 2 days of working, patching on the panels are necessary, though.
Manager Steve asked me to not caulk areas without being done patching on panels.
8.00 VIEW PDF CSV

19624

September 6, 2024 QLD Breeze Riverside CTS 52565 West End 43 Ferry Rd Visitor parking 13.00 VIEW PDF CSV

19623

September 6, 2024 SA Hicrete Precast Systems Pty Ltd Metro Parade - Mawson Lakes *Level ground floor 1, 2
*panel face leveling
*Patching
*Sanding
*repair caulking
8.00 VIEW PDF CSV

19622

September 6, 2024 SA United Precast UP1149 - TMX Noumed - 6 Enterprise Dr Ground 4.00 VIEW PDF CSV

19621

September 6, 2024 SA Bianco Precast Xavier College Stage 4 Ground floor 8.00 VIEW PDF CSV

19620

September 4, 2024 QLD ADSEAL ADMIN Sites 4.00 VIEW PDF CSV

19619

September 5, 2024 SA United Precast Bald Hills Road Mount Barker Ladder work and boom work 15.00 VIEW PDF CSV

19618

September 5, 2024 SA United Precast UP1104 - 13 Metro Parade Basement and level 1 5.50 VIEW PDF CSV