CSV

Row ID

Date

STATE

Customer

Job Site

Location of Works TTL LBR View PDF CSV

19794

September 26, 2024 SA Bert Farina Construction 23 Adelphi Terrace, Glenelg North Patching done on the balcony with the dogbox and sanding level ground floor to 7. 18.00 VIEW PDF CSV

19793

September 26, 2024 SA Bianco Precast Cullinan Grounting 46 tubes up on the top of the lid
Dry packing
We dry packing 8 faces, also it was a slow process to get up to the lid and grouting the tubes on top of it. No hoist between 13 and 16, so we had to take the bags through the stairwell.
17.50 VIEW PDF CSV

19792

September 25, 2024 NSW ADSEAL ADMIN Site and office 10.00 VIEW PDF CSV

19791

September 25, 2024 SA United Precast UP1185 Mental Health Ground 8.00 VIEW PDF CSV

19790

September 24, 2024 NSW ADSEAL ADMIN Site and office 10.00 VIEW PDF CSV

19789

September 23, 2024 NSW ADSEAL ADMIN Site and office 9.75 VIEW PDF CSV

19788

September 26, 2024 SA United Precast UP1185 Mental Health Ground 2.50 VIEW PDF CSV

19787

September 24, 2024 SA United Precast 50 Franklin St, Adelaide Level 16 eastern wall 6.50 VIEW PDF CSV

19786

September 25, 2024 SA United Precast Warehouse Foundary (UP1169) Internal caulking 8.50 VIEW PDF CSV

19785

September 25, 2024 SA Bianco Precast Adelaide Market Square Basement 16.00 VIEW PDF CSV

19784

September 25, 2024 SA Bianco Precast Parkline Kent Town Caulking and grouting filling tubes.
Ground Floor.
24.00 VIEW PDF CSV

19783

September 25, 2024 QLD RCC Builders West End 11 Ferry Rd Level 4 and 5 2.00 VIEW PDF CSV

19782

September 25, 2024 SA Bianco Precast Xavier College Stage 4 Ground Floor 8.00 VIEW PDF CSV

19781

September 25, 2024 SA Hicrete Precast Systems Pty Ltd National Storage Marion Interior caulking, mostly ladder work.
First storage right at the front.
Job completed
7.00 VIEW PDF CSV

19780

September 25, 2024 NSW Fleetwood Urban PO029762, 21 Spurway, Norwest NSW - Ramp 2,
Stair 1,2&3
15.00 VIEW PDF CSV