Row ID

Date

STATE

Customer

Job Site

Location of Works TTL LBR View PDF CSV

22175

July 1, 2025 SA Bianco Precast Norwood Green - Stage 3 Nelson Tower Internal and external Drypacking.
Internal caulking.
21.50 VIEW PDF CSV

22174

July 1, 2025 QLD CIP Constructions Group (QLD) PTY LTD C4-054C-0032 - Oxley 32 Blunder Road Level 1 8.00 VIEW PDF CSV

22173

July 1, 2025 SA United Precast UP1246 - Bowden GF Internal joints 8.00 VIEW PDF CSV

22172

July 1, 2025 QLD ADSEAL ADMIN Site and office 9.50 VIEW PDF CSV

22171

June 30, 2025 QLD ADSEAL ADMIN Site and office 10.00 VIEW PDF CSV

22170

July 1, 2025 SA United Precast UP1216 - Ottelo Apartment Kent Town location: boundary wall next to multiplex building and ground floor, room at the back of the building.
task 1 : interior caulking and double caulking the boundary room next to multiple, building.
task 2 : placing backing rod on top of panels.

obs. 3 tubes of 620 were used for placing backing rod on top of panels

8.50 VIEW PDF CSV

22169

June 30, 2025 SA Hicrete Precast (Pelligra) Pty Ltd 561 Grand Junction road Back warehouse. 18.00 VIEW PDF CSV

22168

July 1, 2025 SA Multiplex Parkline - Kent Town Level 4, level 5, and level 7. 16.00 VIEW PDF CSV

22167

July 1, 2025 SA United Precast UP1246 - Bowden GF Middle staircase 4.00 VIEW PDF CSV

22166

July 1, 2025 QLD JKR Group VISY - Bunker Bunker 15.50 VIEW PDF CSV

22165

July 1, 2025 SA Hicrete Precast (Pelligra) Pty Ltd 561 Grand Junction road Stacking 112 props. 11.50 VIEW PDF CSV

22164

June 30, 2025 SA Bianco Precast Uniting - Bowden Level 6 8.00 VIEW PDF CSV

22163

June 30, 2025 SA United Precast UP1246 - Bowden GF Internal joints 5.00 VIEW PDF CSV

22162

June 30, 2025 SA United Precast UP1217 - Lindsay Charging Room Last bits and pieces 2.50 VIEW PDF CSV

22161

June 30, 2025 SA United Precast UP1246 - Bowden GF area: completed the exterior, but one line in front of the office we could not reach with the boom, cause it is behind the office and lunch room, I need to place the boom next to the panels to reach it, however there are load of material place right next to it. I talked to the builder, he said next weekend he will ask for the crane remove it.
remaining interior caulking on the scaffold.
6.50 VIEW PDF CSV