22018

June 17, 2025 SA Bianco Precast Norwood Green - Osmond Level 3 8.00 VIEW PDF CSV

22017

June 17, 2025 SA United Precast UP1174 - Junction Apartments Mab Court. Level 5 and 6.
Interior caulking. Horizontal and vertical.
Task 1, caulking interior lines.
Task 2, placing the backing rod on top of the panels, behind all columns, in order to prevent any grout leaking.
5.50 VIEW PDF CSV

22016

June 17, 2025 SA United Precast Adelaide Crows Redevelopment Location: 5 panels facing south road.
Task: Interior caulking, vertical lines. Ladder work. After this, I head to Townsley.
2.50 VIEW PDF CSV

22015

June 17, 2025 SA United Precast UP1104 - 13 Metro Parade Level 9 6.50 VIEW PDF CSV

22014

June 17, 2025 QLD QPI ( Queensland Panel Installations ) Brassal 29 Bulloo crescent Panel installation, and lock in 6.50 VIEW PDF CSV

22013

June 16, 2025 NSW De Martin & Gasparini 8-10 Lee Street Haymarket Level 4-2 8.00 VIEW PDF CSV

22012

June 16, 2025 SA Bianco Precast Adelaide Market Square - Plates Lift north level 6 and 7 8.00 VIEW PDF CSV

22011

June 16, 2025 SA Bianco Precast Uniting - Bowden Level 5. 24.00 VIEW PDF CSV

22010

June 16, 2025 QLD CIP Constructions Group (QLD) PTY LTD C4-054C-0032 - Oxley 32 Blunder Road Level 1 16.00 VIEW PDF CSV

22009

June 16, 2025 QLD QPI ( Queensland Panel Installations ) Brassal 29 Bulloo crescent Ground floor 9.00 VIEW PDF CSV

22008

June 16, 2025 SA United Precast UP1161 - 23 Gray street, Adelaide Area top level:
Task: remaining double caulking on vertical lines ( lift shaft)
Remaining caulking on lines located on hanging panels on scaffold.
3.00 VIEW PDF CSV

22007

June 16, 2025 SA United Precast UP1196 - Lot 59 Interior and exterior caulking using boom
Area. Front facade missing lines using a boom lift, exterior caulking and remaining missing areas everywhere, on scaffold, back facade, interior caulking on ground level, 1, 2, 3 and top level.
Task 1: caulking on boom lift, preparing area, set up exclusion zones and induction.
Task 2: interior and exterior caulking, ladder work, mainly on difficult access areas. Places such as the back scaffold, areas where there was screen protection and so on.
5.00 VIEW PDF CSV

22006

June 16, 2025 SA Bianco Precast Adelaide Market Square Level 10 4.25 VIEW PDF CSV

22005

June 16, 2025 SA Bianco Precast Uniting - Bowden Level 5 3.25 VIEW PDF CSV

22004

June 16, 2025 QLD JKR Group VISY - Cullet Lift panels and back of new panels 9.50 VIEW PDF CSV