Row ID

Date

STATE

Customer

Job Site

Location of Works TTL LBR View PDF CSV

20597

January 7, 2025 SA Bianco Precast Norwood Green - Stage 3 Nelson Tower **First Part of the Day:**
We began the work by filling the base of 9 panels on the inner side of the structure, as access to the outer side was not adequate for carrying out the activity. After filling, we waited the necessary time for the base grout to dry properly, which will allow us to start applying the “splashes” on the panels.

**Second Part of the Day:**
In the afternoon, we prepared 5 bags of SikaGrout and applied them to the tubes of 4 panels. This step was carried out in order to apply the “splashes” at the required points. The base on the opposite side, in turn, was only equipped with backroad, which allowed the grout application to be carried out, ensuring the adhesion and stability of the panels.

**Observations:**
The work was carried out according to the established schedule, and all procedures were executed in compliance with safety and quality standards.

16.00 VIEW PDF CSV

20596

January 7, 2025 SA Bianco Precast Gleeson College Ground floor 16.00 VIEW PDF CSV

20595

January 6, 2025 SA Bianco Precast Norwood Green - Osmond Ground floor.
Internal and external caulking.
6.50 VIEW PDF CSV

20594

January 6, 2025 SA Bianco Precast Gleeson College Ground floor 24.00 VIEW PDF CSV

20593

January 6, 2025 SA Bianco Precast Norwood Green - Stage 3 Nelson Tower Ground Floor 18.00 VIEW PDF CSV

20592

January 2, 2025 NSW ADSEAL ADMIN Sydney 1.00 VIEW PDF CSV

20591

December 27, 2024 NSW ADSEAL ADMIN Site and office 3.50 VIEW PDF CSV

20590

December 26, 2024 NSW ADSEAL ADMIN Site and office 4.00 VIEW PDF CSV

20589

December 23, 2024 NSW ADSEAL ADMIN Site and office 11.50 VIEW PDF CSV

20588

December 24, 2024 NSW ADSEAL ADMIN Storage 2.00 VIEW PDF CSV

20587

December 24, 2024 NSW ADSEAL ADMIN Sydney 2.00 VIEW PDF CSV

20586

December 21, 2024 SA Bert Farina Construction 23 Adelphi Terrace, Glenelg North Level 1 and level 2 7.50 VIEW PDF CSV

20585

December 21, 2024 SA ADSEAL ADMIN Supporting the worker.
Picking up tools at the jobsite.
Dropping material.
2.00 VIEW PDF CSV

20584

December 20, 2024 SA ADSEAL ADMIN Checking jobsites.
Picking up and dropping off tools and materials.
Supporting the workers.
9.50 VIEW PDF CSV

20583

December 19, 2024 SA ADSEAL ADMIN Checking jobsites.
Picking up and dropping off tools and materials.
Supporting the workers.
Organizing the roster.
Meeting with customer manager.