21303

April 7, 2025 QLD RCC Builders West End 11 Ferry Rd Level 6 to Level 10 10.50 VIEW PDF CSV

21302

April 7, 2025 SA Bianco Precast Norwood Green - Osmond Level 1. 8.00 VIEW PDF CSV

21301

April 7, 2025 SA United Precast Warehouse Energy Logistix Task: Exterior caulking and double caulking boundary walls behind the structural steel.
Location : North panels
– Small boomlift used and spotter required by the builder.
– Spotter Bryan helped me to put all backing rods into lines, being possible to finish everything in just one day.
– Also, after the spotter had gone I headed to the Energy side of the fence to finish lower lines.
9.50 VIEW PDF CSV

21300

April 7, 2025 SA Bianco Precast Adelaide Market Square Location: Level 3

Activities Performed:
1. First Part of the Day:
– Draft packing continued in the stairs.

2. Second Part of the Day:
– 6 tubes were filled in two panels

Observation
– Issues were encountered during the grouting process at the bottom of the panel, specifically in the internal area where the staircase is attached to the wall. The problem arose due to the lack of proper sealing, as neither silicone nor backer rod was installed, allowing the grout to flow to the lower level, both internally and externally. However, despite this issue, grouting was continued on the ducts located on the other faces of the panel, as those areas were properly sealed.

8.00 VIEW PDF CSV

21299

April 7, 2025 SA United Precast UP1216 - Ottelo Apartment Kent Town Ground flor and level 1 7.50 VIEW PDF CSV

21298

April 7, 2025 SA Bert Farina Construction 23 Adelphi Terrace, Glenelg North Apartment 01 and apartment 110 Balcony 8.00 VIEW PDF CSV

21297

April 4, 2025 SA United Precast UP1190 - Leitcht Rd Internal joints 7.50 VIEW PDF CSV

21296

April 2, 2025 SA United Precast UP1195 Regency Road Boom 8.00 VIEW PDF CSV

21295

April 4, 2025 SA ADSEAL ADMIN hecking jobsites.
Supporting the workers.
Picking up and dropping off tools and materials.
Organizing the roster.
11.00 VIEW PDF CSV

21294

April 3, 2025 SA ADSEAL ADMIN hecking jobsites.
Supporting the workers.
Picking up and dropping off tools and materials.
Organizing the roster.
11.75 VIEW PDF CSV

21293

April 2, 2025 SA ADSEAL ADMIN hecking jobsites.
Supporting the workers.
Picking up and dropping off tools and materials.
Organizing the roster.
Meeting with site manager.
11.75 VIEW PDF CSV

21292

April 1, 2025 SA ADSEAL ADMIN hecking jobsites.
Supporting the workers.
Picking up and dropping off tools and materials.
Organizing the roster.
11.75 VIEW PDF CSV

21291

March 31, 2025 SA ADSEAL ADMIN Checking jobsites.
Supporting the workers.
Picking up and dropping off tools and materials.
Organizing the roster.
11.75 VIEW PDF CSV

21290

April 4, 2025 QLD ADSEAL ADMIN Office 1.50 VIEW PDF CSV

21289