Row ID |
Date |
STATE |
Customer |
Job Site |
Location of Works | TTL LBR | View | CSV | |
---|---|---|---|---|---|---|---|---|---|
21134 |
March 20, 2025 | QLD | BRISBANE PRE-CAST UNIT TRUST T/A Brisbane Pre-Cast Pty Ltd | West End 11 Ferry Rd | Level 10 | 2.50 | VIEW | CSV | |
21133 |
March 20, 2025 | SA | Bert Farina Construction | 23 Adelphi Terrace, Glenelg North | Level 01, Front of the building and left side corridor | 7.00 | VIEW | CSV | |
21132 |
March 19, 2025 | QLD | RCC Builders | West End 11 Ferry Rd | B1, Level 8 and 9 | 16.00 | VIEW | CSV | |
21131 |
March 20, 2025 | SA | United Precast | Port Augusta - Bunnings | Ground | 20.00 | VIEW | CSV | |
21130 |
March 19, 2025 | QLD | JKR Group | Yatala 222 Stapylton Jacobs Well Rd - VISY | MCC & Cullet | 8.00 | VIEW | CSV | |
21129 |
March 18, 2025 | QLD | JKR Group | Yatala 222 Stapylton Jacobs Well Rd - VISY | MCC | 8.00 | VIEW | CSV | |
21128 |
March 19, 2025 | SA | Bianco Precast | Uniting - Bowden | Location: caulking on north west panels. – We did not have access to the South east panels due to an exclusion zone for a concrete pumper. -It was done exterior caulking and grouting tubes using the dog box, cage. – 8 tubes filled out on a panel that was installed by mistake with tubes facing the exterior face using a dog box for access. – Material: 6 bags of grouting sika GP used in the tubes. – John arrived around lunch time to help Angelo in order to mix grouting and pass through canes while Angelo was moving inside the cage. 1 task: arrived 7 to 8:30 Fill out swms, set up exclusion zone, check and pass harness code, cage checking, pre-start, checking access to tubes that would be grouting, making sure all requirements were met before starting, waiting on harness checking. 2 task: 8:30 to 12:30 caulking: exterior caulking using a dog box, crane crew very slow, and too much smoking time. 3 task: 12:30 to 15:30 Slow process due to difficult access to the panels since there were some trees on our way, the cage had to be positioned above a pathway and cycling lane, too much waiting time in position the cage next to panels and also a spotter was needed provided by the builder, further more it was needed moving fences, and so on. |
11.00 | VIEW | CSV | |
21127 |
March 18, 2025 | SA | United Precast | UP1235 - Warehouse Centuria | Internal and external joints | 9.00 | VIEW | CSV | |
21126 |
March 19, 2025 | QLD | QPI ( Queensland Panel Installations ) | North McLean 100 Crowson Lane | Ground floor | 8.00 | VIEW | CSV | |
21125 |
March 19, 2025 | SA | Bianco Precast | Adelaide Market Square | Level 3. | 28.50 | VIEW | CSV | |
21124 |
March 18, 2025 | QLD | QPI ( Queensland Panel Installations ) | North McLean 100 Crowson Lane | Ground floor | 8.00 | VIEW | CSV | |
21123 |
March 18, 2025 | QLD | RCC Builders | West End 11 Ferry Rd | B1, B2, B3 and Level 6 | 13.50 | VIEW | CSV | |
21122 |
March 18, 2025 | SA | Bianco Precast | Uniting - Bowden | Level 1. | 5.00 | VIEW | CSV | |
21121 |
March 18, 2025 | SA | United Precast | UP1104 - 13 Metro Parade | Location Mawson lakes. Level 6, exterior caulking, little columns. All around the exterior, north panels, west panels, south panels, where I could reach without a dog Box. | 4.00 | VIEW | CSV | |
21120 |
March 18, 2025 | SA | United Precast | UP1193 Signlab | Exterior caulking, external side wall and also 3-4 joints in neighbors driveway. From 11 to 3, because power lines were turned off. | 4.00 | VIEW | CSV |