21134

March 20, 2025 QLD BRISBANE PRE-CAST UNIT TRUST T/A Brisbane Pre-Cast Pty Ltd West End 11 Ferry Rd Level 10 2.50 VIEW PDF CSV

21133

March 20, 2025 SA Bert Farina Construction 23 Adelphi Terrace, Glenelg North Level 01, Front of the building and left side corridor 7.00 VIEW PDF CSV

21132

March 19, 2025 QLD RCC Builders West End 11 Ferry Rd B1, Level 8 and 9 16.00 VIEW PDF CSV

21131

March 20, 2025 SA United Precast Port Augusta - Bunnings Ground 20.00 VIEW PDF CSV

21130

March 19, 2025 QLD JKR Group Yatala 222 Stapylton Jacobs Well Rd - VISY MCC & Cullet 8.00 VIEW PDF CSV

21129

March 18, 2025 QLD JKR Group Yatala 222 Stapylton Jacobs Well Rd - VISY MCC 8.00 VIEW PDF CSV

21128

March 19, 2025 SA Bianco Precast Uniting - Bowden Location: caulking on north west panels.
– We did not have access to the South east panels due to an exclusion zone for a concrete pumper.
-It was done exterior caulking and grouting tubes using the dog box, cage.
– 8 tubes filled out on a panel that was installed by mistake with tubes facing the exterior face using a dog box for access.
– Material: 6 bags of grouting sika GP used in the tubes.
– John arrived around lunch time to help Angelo in order to mix grouting and pass through canes while Angelo was moving inside the cage.
1 task: arrived 7 to 8:30
Fill out swms, set up exclusion zone, check and pass harness code, cage checking, pre-start, checking access to tubes that would be grouting, making sure all requirements were met before starting, waiting on harness checking.
2 task: 8:30 to 12:30 caulking: exterior caulking using a dog box, crane crew very slow, and too much smoking time.
3 task: 12:30 to 15:30
Slow process due to difficult access to the panels since there were some trees on our way, the cage had to be positioned above a pathway and cycling lane, too much waiting time in position the cage next to panels and also a spotter was needed provided by the builder, further more it was needed moving fences, and so on.
11.00 VIEW PDF CSV

21127

March 18, 2025 SA United Precast UP1235 - Warehouse Centuria Internal and external joints 9.00 VIEW PDF CSV

21126

March 19, 2025 QLD QPI ( Queensland Panel Installations ) North McLean 100 Crowson Lane Ground floor 8.00 VIEW PDF CSV

21125

March 19, 2025 SA Bianco Precast Adelaide Market Square Level 3. 28.50 VIEW PDF CSV

21124

March 18, 2025 QLD QPI ( Queensland Panel Installations ) North McLean 100 Crowson Lane Ground floor 8.00 VIEW PDF CSV

21123

March 18, 2025 QLD RCC Builders West End 11 Ferry Rd B1, B2, B3 and Level 6 13.50 VIEW PDF CSV

21122

March 18, 2025 SA Bianco Precast Uniting - Bowden Level 1. 5.00 VIEW PDF CSV

21121

March 18, 2025 SA United Precast UP1104 - 13 Metro Parade Location Mawson lakes. Level 6, exterior caulking, little columns. All around the exterior, north panels, west panels, south panels, where I could reach without a dog Box. 4.00 VIEW PDF CSV

21120

March 18, 2025 SA United Precast UP1193 Signlab Exterior caulking, external side wall and also 3-4 joints in neighbors driveway. From 11 to 3, because power lines were turned off. 4.00 VIEW PDF CSV