21596

May 9, 2025 SA United Precast UP1163 - West Beach Driving Range Ground 6.50 VIEW PDF CSV

21595

May 10, 2025 QLD RCC Builders 11 Ferry Rd West End Level 11 5.00 VIEW PDF CSV

21594

May 9, 2025 QLD Apollo Property Keperra 15 Ridgeline Way External area 12.50 VIEW PDF CSV

21593

May 9, 2025 SA Bianco Precast Adelaide Market Square Location: level 4 and 3 ( liftshaft and panels located in the stairs facing grote street)
27 bags, grouting using platform ladder and on scaffolding
Task: fixing eboflex, dry packing level 4 near the stair facing north, and grouting panels.
19 tubes totally filled.
14 partially filled, which we couldn’t finish it because of leaking.
23.50 VIEW PDF CSV

21592

May 9, 2025 SA Multiplex Market Square Level 1: near to hoister
Grouting joint in the floor
3 bags of fosroc used.
Job required by George (multiplex job site manager)
0.50 VIEW PDF CSV

21591

May 9, 2025 QLD Paynters Pty Ltd PO193949 - QRP0301 Caboolture Cancer Care Site 4.50 VIEW PDF CSV

21590

May 9, 2025 NSW Forge outdoors Pty Ltd PO030459 BRICK PIT RESERVE French Forest Section 1 – Ramp 24.00 VIEW PDF CSV

21589

May 9, 2025 SA Bianco Precast Uniting - Bowden Level 3 16.00 VIEW PDF CSV

21588

May 8, 2025 SA Bianco Precast Uniting - Bowden Level 3 16.00 VIEW PDF CSV

21587

May 9, 2025 QLD Peak Precast Ferny Grove 47 Conavalla street Level 2,3 11.75 VIEW PDF CSV

21586

May 8, 2025 QLD Apollo Property Keperra 15 Ridgeline Way External Area 16.00 VIEW PDF CSV

21585

May 8, 2025 SA Bianco Precast Adelaide Market Square - Plates Location: stair facing gouge street, basement 1 and 2
Task: patching 5 plates using fosroc HB
2 bags of fosroc HB
5 plates completed
2.00 VIEW PDF CSV

21584

May 8, 2025 SA Bianco Precast Adelaide Market Square Area: stairs 1 and 2 facing grote and gouge street, filling out tubes level, 2 and 3
Area 2: grouting lift shaft lid facing gauge street
Area 3: basement 2 and 1 patching plates.
Task 1: we finished to grout tubes on both stairs, with extension hose since tubes
were very close to ceiling.

Task 3: filling out tubes on top of the lid. Difficult access to tubes, no ladder to reach the top. We had to climb up through scaffolding, lid no caulked inside, long process
due to leaking on corners and plates.
– Angelo worked for 2 hours doing patching and remaining time helping the boys.
– Around 30 minutes of stop working due to training evacuation and test. The whole
building had to stop working.
39 tubes filled
15 bags used of grouting

22.00 VIEW PDF CSV

21583

May 7, 2025 QLD ADSEAL ADMIN Site and office 7.50 VIEW PDF CSV

21582

May 8, 2025 NSW De Martin & Gasparini 8-10 Lee Street Haymarket Level 4-3-2 16.00 VIEW PDF CSV