Row ID |
Date |
STATE |
Customer |
Job Site |
Location of Works | TTL LBR | View | CSV | |
---|---|---|---|---|---|---|---|---|---|
19621 |
September 6, 2024 | SA | Bianco Precast | Xavier College Stage 4 | Ground floor | 8.00 | VIEW | CSV | |
19620 |
September 4, 2024 | QLD | ADSEAL | ADMIN | Sites | 4.00 | VIEW | CSV | |
19619 |
September 5, 2024 | SA | United Precast | Bald Hills Road Mount Barker | Ladder work and boom work | 15.00 | VIEW | CSV | |
19618 |
September 5, 2024 | SA | United Precast | UP1104 - 13 Metro Parade | Basement and level 1 | 5.50 | VIEW | CSV | |
19617 |
September 5, 2024 | QLD | Breeze Riverside CTS 52565 | West End 43 Ferry Rd | Visitor parking | 16.00 | VIEW | CSV | |
19616 |
September 5, 2024 | SA | Hicrete Precast Systems Pty Ltd | National Storage Marion | Interior and exterior caulking Local: Upstairs level, storage right up front. Obs. Extra boundary joint, between hicrete panels and neighbors next door, required by the builder steve. 10 meters |
8.00 | VIEW | CSV | |
19615 |
September 5, 2024 | SA | Bert Farina Construction | 23 Adelphi Terrace, Glenelg North | Level 3/2/1 | 16.50 | VIEW | CSV | |
19614 |
September 5, 2024 | SA | Bianco Precast | Xavier College Stage 4 | Ground floor. | 24.00 | VIEW | CSV | |
19613 |
September 4, 2024 | QLD | Breeze Riverside CTS 52565 | West End 43 Ferry Rd | Visitor parking | 26.50 | VIEW | CSV | |
19612 |
September 4, 2024 | SA | United Precast | Warehouse Foundary (UP1169) | Warehouse caulking | 8.50 | VIEW | CSV | |
19611 |
September 4, 2024 | SA | United Precast | Colley Terrace | Ground floor | 2.00 | VIEW | CSV | |
19610 |
September 4, 2024 | SA | Bert Farina Construction | 23 Adelphi Terrace, Glenelg North | Level 1/2/3 | 15.00 | VIEW | CSV | |
19609 |
September 4, 2024 | NSW | ADSEAL | ADMIN | Site and office | 10.50 | VIEW | CSV | |
19608 |
September 4, 2024 | SA | Hicrete Precast Systems Pty Ltd | National Storage Marion | Interior and exterior caulking. Local: ground floor (middle storage) and exterior caulking right in the back of the land. Exterior caulking in the back of the building done. Exterior caulking on the boomlift |
8.25 | VIEW | CSV | |
19607 |
September 4, 2024 | SA | Bianco Precast | Parkline Kent Town | Ground floor. | 24.00 | VIEW | CSV |