Row ID

Date

STATE

Customer

Job Site

Location of Works TTL LBR View PDF CSV

19566

August 28, 2024 QLD ADSEAL ADMIN Office 8.00 VIEW PDF CSV

19565

August 29, 2024 SA United Precast Colley Terrace Exterior caulking, North facade remaining joints, level 3 4, 5 and remaining spots where packs were coming off the joints. Also a bit of black caulking on the balcony at second level. Lots of bits and pieces everywhere. Joints on scaffold and difficult access.
It was used, Sikaflex Pro black
6.00 VIEW PDF CSV

19564

August 29, 2024 SA United Precast UP1104 - 13 Metro Parade Level1 7.50 VIEW PDF CSV

19563

August 29, 2024 SA Hicrete Precast Systems Pty Ltd Angle vale Shopping Patching and caulking. 8.00 VIEW PDF CSV

19562

August 29, 2024 SA Bianco Precast Bloom Apartment Level 6 24.00 VIEW PDF CSV

19561

August 29, 2024 SA United Precast Victoria Tower TEST – PLEASE forward EMAIL to greg.w@adsealgroup.com that DSO was received 1.00 VIEW PDF CSV

19560

August 28, 2024 NSW ADSEAL ADMIN Sydney 0.50 VIEW PDF CSV

19559

August 26, 2024 NSW ADSEAL ADMIN Sydney 1.00 VIEW PDF CSV

19558

August 29, 2024 NSW Avant Construction Kemps Creek - AusConnex Ground 16.00 VIEW PDF CSV

19557

August 29, 2024 NSW ADSEAL ADMIN Storage 8.00 VIEW PDF CSV

19556

August 28, 2024 NSW Avant Construction Kemps Creek - AusConnex Ground 24.75 VIEW PDF CSV

19555

August 28, 2024 SA United Precast UP1168 TRP WAREHOUSE Warehouse caulking 7.50 VIEW PDF CSV

19554

August 28, 2024 SA Bianco Precast Bloom Apartment Grouting works. 1.50 VIEW PDF CSV

19553

August 28, 2024 SA Hicrete Precast Systems Pty Ltd Metro Parade - Mawson Lakes Patching on the lift shafts gaps and holes, Level 1 and 2. 5.50 VIEW PDF CSV

19552

August 28, 2024 SA Hicrete Precast Systems Pty Ltd Park Street North Woodville Patching the precast panels (Outside) face to Torrens Road + Some spots as per site manager requirements.
Spotter required.
5.00 VIEW PDF CSV