Row ID |
Date |
STATE |
Customer |
Job Site |
Location of Works | TTL LBR | View | CSV | |
---|---|---|---|---|---|---|---|---|---|
20462 |
December 4, 2024 | SA | ADSEAL | ADMIN | Checking jobsites. Supporting the workers. Picking up and dropping off tools and materials. Organizing the roster. |
11.75 | VIEW | CSV | |
20461 |
December 3, 2024 | SA | ADSEAL | ADMIN | Checking jobsites. Supporting the workers. Picking up and dropping off tools and materials. Organizing the roster. Meeting with site manager. |
11.75 | VIEW | CSV | |
20460 |
December 2, 2024 | SA | ADSEAL | ADMIN | Checking jobsites. Supporting the workers. Picking up and dropping off tools and materials. Organizing the roster. |
11.75 | VIEW | CSV | |
20459 |
December 6, 2024 | SA | Hicrete Precast Systems Pty Ltd | Thebarton | When I arrived at the location, the warehouses were closed. I spent some time looking for a place and got in touch with Hicrete, Woolcock and the neighbor. Work was not done because it was not scheduled with the neighbor. |
2.00 | VIEW | CSV | |
20458 |
December 7, 2024 | SA | Bianco Precast | Adelaide Market Square | Groundfloor | 22.50 | VIEW | CSV | |
20457 |
December 6, 2024 | SA | Bianco Precast | Adelaide Market Square | On the morning of 6/12/24, the team began the task of filling 16 tubes on the B2 level and, simultaneously, made some splashes on 10 tubes on the ground floor. During the work, around 10:50 AM, the CFMEU supervisor requested a work stoppage. The reason for the interruption was the lack of appropriate face shields for mixing the grout, as required by safety regulations for handling this material.
After the lunch break, the supervisor informed us that, in addition to the face shields, it was also necessary to wear specific overalls for grout mixing, which led to a second work stoppage, as the team was not properly equipped. However, this situation had never occurred before. The work was then suspended until the correct equipment was provided. This situation caused delays in the tasks scheduled for the day, and the work could not resume until the issue with the Personal Protective Equipment (PPE) was resolved. |
38.50 | VIEW | CSV | |
20456 |
December 5, 2024 | SA | Bert Farina Construction | 23 Adelphi Terrace, Glenelg North | Groundfloor outside | 8.00 | VIEW | CSV | |
20455 |
December 6, 2024 | SA | Bianco Precast | Adelaide Market Square | Level 1 | 15.00 | VIEW | CSV | |
20454 |
December 6, 2024 | SA | Bianco Precast | Adelaide Market Square | Caulking on stairs level 1 and basement. | 6.75 | VIEW | CSV | |
20453 |
December 6, 2024 | NSW | ADSEAL | ADMIN | Site and office | 11.00 | VIEW | CSV | |
20452 |
December 5, 2024 | NSW | ADSEAL | ADMIN | Site and office | 11.00 | VIEW | CSV | |
20451 |
December 6, 2024 | QLD | RCC Builders | West End 11 Ferry Rd | Level 6, 8 and 10 | 8.00 | VIEW | CSV | |
20450 |
December 6, 2024 | NSW | RAR Rigging | Canberra | Level 7&8 | 22.00 | VIEW | CSV | |
20449 |
December 4, 2024 | QLD | Peak Precast | Main Beach 16 Hughes Avenue | Level 9 | 8.50 | VIEW | CSV | |
20448 |
December 5, 2024 | SA | Bianco Precast | Parkline Kent Town | Internal caulking on level 2 and 3. Bits and pieces on level 1. |
3.50 | VIEW | CSV |