21202

March 28, 2025 SA Bianco Precast Adelaide Market Square Area: lift shaft and stairs 3, on level 3.
Task: interior caulking in the dog box, and interior caulking, lines in the Star.
3.50 VIEW PDF CSV

21201

March 28, 2025 SA Bianco Precast Norwood Green - Osmond Task: interior and exterior caulking, following installation.
AREA: level 1.
Color Sika off-white
3.50 VIEW PDF CSV

21200

March 28, 2025 SA Bianco Precast North East Isuzu Port weakfiled, North East Isuzu
One joint double caulked.
Ladder work, 3.5 meters. Far from the city.
1.00 VIEW PDF CSV

21199

March 28, 2025 SA ADSEAL ADMIN 23 Adelphi Terrace, Glenelg ( Bert Farina )

Level 5,4,3,2 and apartment 010

8.00 VIEW PDF CSV

21198

March 28, 2025 SA Bianco Precast Uniting - Bowden Level 2. 15.00 VIEW PDF CSV

21197

March 27, 2025 SA Bert Farina Construction 23 Adelphi Terrace, Glenelg ( Bert Farina )

Ground floor, apartment 101

8.00 VIEW PDF CSV

21196

March 27, 2025 QLD RCC Builders West End 11 Ferry Rd Level 6 and 8 8.00 VIEW PDF CSV

21195

March 27, 2025 SA United Precast UP1205 - Lai Industries Warehouse Dodo panels 7.50 VIEW PDF CSV

21194

March 27, 2025 QLD JKR Group Yatala 222 Stapylton Jacobs Well Rd - VISY Cullet 8.00 VIEW PDF CSV

21193

March 27, 2025 SA Bianco Precast Uniting - Bowden External caulking level 1 and 2 on dogbox.
Internal caulking level 2.
5.50 VIEW PDF CSV

21192

March 27, 2025 SA HMV Structural 8 Athol St, Athol Park caulking between stair and precast panel 1.50 VIEW PDF CSV

21191

March 27, 2025 NSW ADSEAL ADMIN Sydney 8.00 VIEW PDF CSV

21187

March 27, 2025 SA Bianco Precast Uniting - Bowden Level 2 16.00 VIEW PDF CSV

21186

March 27, 2025 SA United Precast Victoria Tower Task: Interior caulking, Lid on top of lift shaft.
Area: Level 37, slow job due to, wasting time on waiting on the hoister to come up and come down, bring all material upstairs, also moving the Mobile scaffolding inside the lift shaft in order to reach all areas.
lines were broken and larger so I had to pump silicone in as requested by Damien.
3.00 VIEW PDF CSV

21185

March 27, 2025 SA United Precast UP1229 - Harmony Estate Area: Around the ramp, retaining walls near trenches and all remaining areas.
Task: Interior and exterior caulking. builder lent a boom lift for high tops areas.
5.75 VIEW PDF CSV